Bamboo Flooring Glue With Moisture Barrier

R1535 is a one part trowel applied 100 solids moisture cure urethane adhesive specifically designed for installation of bamboo solid wood and engineered wood flooring.
Bamboo flooring glue with moisture barrier. There are many brands on the market that are very well known such as bostik and titebond and can be found in most big box stores. Adobe reader can be downloaded here. Roberts r1509 is 100 solids moisture cure urethane adhesive glue formulated for the installation of solid engineered and parquet wood flooring. To help minimize moisture content transfer from the concrete slab into bamboo flooring a moisture barrier should be.
It is also recommended for bamboo flooring. The exceptional formula provides a flexible tenacious bond moisture vapor barrier sound reducer and crack suppressant in one simple 4 in 1 single step adhesive. Solid engineered strand woven hand scraped dyed nail glue or float. It has an ultra low voc content and is low odor so you can relax knowing that you are using.
You don t necessarily need an underlayment but you will need a moisture barrier the padding built into the flooring is not a moisture barrier. A subfloor of 1 1 8 plywood over joists at 16 on center is highly recommended. Mvp bostik moisture barrier 5 gallon. Titebond 531 rolls on like paint and cali complete with metallic seal tape also an underlayment.
Award winning bamboo flooring completely non toxic formaldehyde free zero voc and third party certified to be safe durable and eco friendly. Roberts r1509 is a solvent free adhesive which meets the low voc requirements of the south coast air quality management district. It can be used on both engineered and solid hardwood floors in conjunction with bostik wood flooring adhesives. Urethane flooring adhesive with moisture and sound barrier also used for solid hardwoods.
Concrete must be dry and fully cured at least 60 days. This flooring adhesive with moisture and sound barrier provides a moisture barrier to protect your floor from any moisture transmitted from a sub floor as well as filling in any cracks or ridges in the concrete. In order to achieve the proper vapor barrier you must use a 1 4 x 1 4 v notch trowel. Bamboo flooring should be within 3 of subfloor moisture content.
We recommend either of these. Hope this helps walker.