Behr Concrete And Garage Floor Paint Dry Time

Behr garage floor paint 2 part epoxy drying time.
Behr concrete and garage floor paint dry time. Allow 72 hours before subjecting surface to heavy foot traffic or repositioning furniture. Apply the second coat in a criss cross direction for uniformity of appearance. It is essential to have a properly cleaned and prepped surface. Allow the first coat to dry for at least 4 6 hours before re coating if necessary.
Behr premium 1 part epoxy concrete garage floor paint is rated 3 3 out of 5 by 126. Rated 5 out of 5 by joea from simply the best around i used this 1 part epoxy paint last weekend on my garage and it turned out just amazing. The behr premium granite grip paint comes in a black and grew paint can with colors ranging from tan to amethyst. This 100 acrylic formula is great for both wood and concrete surfaces and between our host of custom colors and computer color matching the look you want is always within reach.
Get it right the first time. Disposal blank space if empty. Preparation of uncoated concrete. The finish is resistant to household type chemicals oil and gasoline which reduces the need for maintenance of hard to clean interior or exterior.
Behr premium interior exterior concrete garage self priming 1 part epoxy is a high performance ready to use single component water based floor paint that resists hot tire pickup and marring. Normal drying time for the behr garage floor paint 1 part epoxy is two hours to the touch. If you have a wood porch then view our video on how to apply behr premium porch patio floor paint for wood. Bring all the decorative qualities of traditional paint to your high traffic indoor and outdoor surfaces with behr premium low lustre enamel porch patio floor paint.
Dry time blank space if empty. Low temperatures or high humidity conditions will affect drying time. Learn how to apply behr premium 1 part epoxy concrete and garage floor paint with this step by step article from behr. Premature heavy traffic will cause paint failure requiring spot recoating.
Drying times vary depending on application and air temperature. Properly dispose of all soiled rags. Proper installation requires concrete surface and air temperatures between 50 and 95 degrees f 10 to 32 degrees c. Full cure should be reached in 7 14 days.
Behr premium porch patio floor paint is an interior exterior 100 acrylic latex mildew resistant finish. The floor may be subjected to light foot traffic after 24 hours. Normal drying time for the behr garage floor paint 2 part epoxy is two hours to the touch. For new or uncoated surfaces please refer to.
Wait at least 30 days before rinsing or. Drying times vary depending on application and air temperature. Longer dry time required in cooler temperatures and in higher humidity. For disposal of empty containers and unused product contact your household refuse collection service.
Protect unused product from freezing.